News

Implementation of the project at UFPB campus IV

It is proposed to start with a pilot of the system, by choosing buildings in some campus, implementing the data collection on them, the data transmission and data visualization as the first mark. This pilot will permit the detection of possible infrastructure problems that affect the implementation of the system.

The second step will improve functionalities of the system, by implementing data analysis, to provide informations like average and peak energy consumption, anomalous utilization, etc.

The Energy Operation of the system will be the next step. In this phase, the system will present in what periods of the day it is possible to switch the power from external source to the local generated source. At this point, some buildings will have solar panels and batteries, and the power connection will can be remotely changed.

Finally, with the obtained results, the utilization of the system in all UFPB buildings wil be proposed to the central administration.

The first implementation of the control board of energy in campus IV

Installation

Grupo Organizador